Skip to content
Monday – Friday: 7 a.m. – 5 p.m.Electrical Contractor · AL Lic. 000000General liability · The owner’s carrier
1 more license
  • Electrical Contractor · AL Lic. 000000
  • General liability · The owner’s carrier
(251) 555-0100

Service entrance and meter

Mast, weatherhead and meter base

The part of the house where the power company’s wire becomes yours. We replace it when wind, water or age has damaged it.

The power company owns the meter and the wire that reaches your house. We own the mast, the weatherhead, the meter base and everything inside. We work up to that line, and the power company reconnects at it.

  • Mast and weatherhead replaced to match the wire’s height and direction

  • New meter base, grounded to a driven electrode

  • Panel connected and every circuit labeled

Meters and fused disconnects mounted on a white brick wall with conduit

When you need it

Signs the service needs work

Any of these means a survey, and some mean calling the power company first.

  • A leaning mast

    Or a wire sagging toward the roof or the yard.

  • A rusted or cracked meter base

    Rust streaks, a cracked cover or water inside.

  • A loose box on the wall

    The meter base is pulling away from the siding or the block.

  • Power flickering after rain

    Water getting into the weatherhead or the base.

  • Scorch marks or a burning smell

    Call 911 first. Do not touch it.

  • A panel too small for the house

    Breakers trip or you are adding an EV charger or a heat pump.

What the visit includes

From survey to reconnect

  • 01

    Survey

    We look at the mast, base, panel and grounding and photograph what we find.

  • 02

    Written estimate

    Each part on its own line, open for 30 days.

  • 03

    Permit

    We pull it, and the fee is passed through at cost.

  • 04

    Work

    The power company cuts the service and we replace what the estimate lists.

  • 05

    Inspection

    The city or county checks it, and we meet the inspector.

  • 06

    Reconnect

    The power company reconnects. The date is theirs.

How pricing works for a service entrance

  • What decides the price

    Five things move the price of a storm repair more than anything else.

    • How high the water or damage reached, and how much of the service it touched

    • The size of the service: 100 amp or 200 amp, and how far the meter sits from the panel

    • Whether the mast, the weatherhead and the meter base are sound or need replacing

    • Whether you raise the panel and meter above the flood line

    • Permit and inspection fees, which we pass through at cost

  • What the estimate includes, and what it doesn’t

    The written estimate lists the meter base, mast, panel, circuits, permit and inspection on their own lines, so an adjuster or a lender can read it. The power company’s own charges and drywall, paint and flooring repair are not in it.

    • Included: survey, parts, labor, permit, the inspection visit

    • Not included: the power company’s charges, drywall, paint, flooring

  • What happens at the visit

    One electrician comes for the survey and stays until the picture is clear. We photograph what we find and we do not price what we cannot see. If we open a wall and find more, we stop and call you.

    • The survey visit has a fee, stated when you book

    • It comes off the work if you go ahead

  • When you get the number

    You get the number in writing after the survey, before any work starts, and it is the number on the invoice unless you change the job. The estimate stays open for 30 days.

    • A change to the job is priced in writing first

    • You sign the estimate before we order parts

Questions we hear after a storm

Who owns the meter?

The power company owns the meter. We own the meter base, the mast and the wiring on your side. For a raise, the power company moves the meter and we move everything it connects to.

Do I need a permit?

Service entrance, meter base and panel work usually needs one. We pull it, and the fee is its own line on your estimate. The owner confirms what the city and county require.

How long will the power be off?

The electrical work often takes a day or two. The longer wait is usually the inspection and the power company’s reconnect, and both schedules are theirs. We tell you what we hear the day we hear it.

Send a photo of your meter and mast

We write back with a time for the survey.